Loading

Bus Rapid Transit System Components:

1. Segregated Lanes for BRT , such as :

- Two bus lanes (lane in each direction) with the ability to operate bypass services in some locations (without stopping at the station)

- The width of each lane is 3.5 meters

- There are no barriers separating the two lanes, which facilitate the movement, flow and bypass of buses when needed.

- The asphalt mixture has a special design to accommodate the axial loads

2. Lane Separators

- An island with a width of 1.6 m for roads that are 40 m wide.

- Electricity Network

- Communication and Irrigation Network

- Planting trees

- Dividing Curbstone, 25 cm wide, for roads that are 30 m wide