Al-Sahafa ( Press ) Tunnel Package General chart

Construction of the infrastructure for BRT Al-Sahafa Tunne

Project Description :

The project includes the construction of two separate bridges dedicated to BRTwith 500 meters long for each bridge, the rehabilitation of Al- Sahafa tunnel the redesign of Al- Sahafa intersection to convert it from a signalized intersection to a roundabout, as well as the works of sidewalks and rainwater drainage network .

Contractor

Haddadin Engineering and Contracting Company

Supervision

Greater Amman Municipality Department of BRT infrastructure

Tender value (not including provisional sum

Provisional sum

Tender value (including provisional sum)

(5489183) JOD

Commencement date

19/08/2017

Project duration

(365) days